Forested green hills rising to a mountain peak under a clear blue sky at the Golden Hills project, Sinjakovo and Jezero
All Projects

Gold–Antimony–Silver–Copper

Golden Hills (Sinjakovo, Jezero)

Location
Sinjakovo, Jezero, BiH
Tenements
2 exploration licences
Area
~80 km²
Ownership
100% Yugo Metals

Overview

The Golden Hills Project is Yugo Metals’ flagship asset, hosting a large gold and antimony system defined by historical workings, surface trenching and extensive soil geochemistry. The project sits within the Tethyan Metallogenic Belt, a globally significant province that hosts numerous world-class gold and base-metal deposits.

Multiple mineralised trends have been identified across the licence area, with gold associated with structurally controlled quartz veining and antimony mineralisation occurring in stibnite-bearing zones. None of these targets have been systematically drill-tested.

Geology & Mineralisation

Mineralisation at Golden Hills (Sinjakovo, Jezero) is hosted in a sequence of metasediments and volcanics cut by later intrusive bodies. Gold occurs within quartz-carbonate veins and adjacent altered wall rock, while antimony is concentrated in discrete stibnite-rich structures.

The style of mineralisation is consistent with an intrusion-related orogenic gold system, offering potential for both near-surface oxide gold and deeper primary mineralisation.

Exploration History & Results

Historical exploration, including Yugoslav-era mapping and sampling, identified widespread gold and antimony anomalism. Recent work by Yugo Metals has included rock-chip sampling, trenching and soil geochemical surveys that returned a standout trench result of 61m @ 1.5 g/t Au from surface.

A coherent gold-in-soil anomaly has been traced over approximately 4km of strike, remaining open in multiple directions.

Next Steps

The Company plans to advance Golden Hills (Sinjakovo, Jezero) toward maiden drill-testing, supported by additional trenching, detailed structural mapping and ground geophysics to refine priority drill targets ahead of a program.

From the Field

Sunlit grassy valley framed by forested mountains at the Erak prospect, Golden Hills project
Erak prospect, looking across the licence area
Field crew in hi-vis and hard hats operating a diamond drill rig at a forested drill site
Drill rig at the Erak prospect
Three field workers excavating and sampling a trench on a steep forested slope
Trenching and channel sampling
Geologist examining turquoise malachite mineralisation on a tunnel wall by torchlight
Malachite in the historic barite tunnels
Barite vein with galena and sphalerite mineralisation, shown with a rock hammer for scale
Barite with galena and sphalerite
View full gallery